Contents - Previous - Next


This is the old United Nations University website. Visit the new site at http://unu.edu


Table 8.3 Contd.

Sl. No. Name of Project Demand
Ulilisation
(TMC)
Protected
Demand
(TMC)
Balance
(TMC)
Demand out of
Balance 75 Per-
cent Dependable
Flows (TMC)
         
22. Bennithora Project 6.01 - 6.01 6.00
23. Gandhorinala Project 3.46 - 3.46 2.20
24. Uppcr Millamari Project 1.30 - 1.30 1.30
25. Lower Millamari Project 4.38 - 4.38 4.40
26. Kagna Project 12.93 - 12.93 2.00
27. Minor Irrigation (K-6) 30.77 6.47 24.30 11.40
28. Minor Irrigation (K-7) 2.88 0.69 2.19 1.66
29. Tungabhadra Project (Left        
Bank Canal Right Bank Low        
Level Canal. Right Bank High        
Level Canal) 147.50 132.00 15.50 9.30
30. Vijayanagar Channels 13.70 5.71 7.99 8.00
31. Rajolibunda Diversion 1.20 1.20 - -
32. Tunga Anicut 11. 50 11.50 - -
33. Bhadra Project 62.00 61.70 - -
34. Bhadra Anicul 3.10 3.10 - -
35. Condi Left Bank        
Canal, Extension 2.00 - 2.00 2.00
36, Ambligola 1.40 1,40 - -
37, Anjanapur 2.50 2.50 - -
38. Dharma Project and Canals 2.20 2.20 - -
39. Hagaribommanahalli 2.00 2.10 - -
40.. Upper Tungabhadra 19.00 - 19.00 -
41. Tungabhadra Foreshore Lift 11.85 - 11.85 -
42. Tungabhadra Diversion 20.00 - 20.00 -
43. Upper Tunga Project 41.00 - 40.0 20.00
44. Upper Bhadra Project 36.11 - .36.00 10.00
45. Madagmasur 2.71 - 2.71 -
46. Dandavathy 2.60 - 2.60 -
47. Varada 7,00 - 7.00 -
48.. Hirehalla 1.06 - - 1.06 -
49, Minor Irrigation (K-8) 100.92 49,04 51.88 23,59
50, Vanivilas Sagar 8,20 8,20 - -
51. Feeder Channel to Ranikere 1.05 - 1.05 1.00
52. Jinigehalla 0.32 - 0.32 1.00
53. Minor Irngation (K-9) 38.20 29.87 8.33 4.25
Total 1432.41) 504.55 926.87 .367.00

Table 8.4 Demands of Maharashtra State

St.. No. Name of Project Demand
(TMC)
Protected
Utilisation
(TMC)
Balance
Demand
(TMC)
Demand out of
Balance 75 Per
cent Dependable
Flows(TMC')
1.Krishna Project 35.9 36.3 (0.6)  
  (1.0) (1.0)    
2. Urmodi Project 6.2 - 6.2 6.2
3. Tarali Project 6.7 - 6.7 6.7
4. Canal ex-Khodshi Weir 5.7 2.7 3.0 3.0
  (2.5) (2.5)    
5. Koyna hydel and Koyna        
Krishna Lift Scheme with Varunji Weir 129.4 74.8 54.6 54.6
6: Wang Project 12.1 - 12.1 12.1
7. Warna Project 57.4 47.7 9.7 9.7
8. Radhanagarj Project 11.0 11.0 -- -
9. Kadvi Irrigation Project 15.6 - 15.6 8.0
1(1. Kasari Irrigation including Kaljewadi 42.4 - 42.4 12.0
11. Kumhhi Irrigation 17.5 - 17.5 10.0
12. Phonda Irrigation Project 4.2 - 4.2 3.0
13. Vedganya Irrigation Project 27.7 - 27.7 10.0
14. Tulshi Project 3.5 2.6 0.9 -
15. Dudhganga project        
(Maharashtra Prtion) 26.0 -- 26.1) 18.0
16. Morna Project 1.6 -- 1.6 1.6
17. Phaya project 1.4 - 1.4 1.4
18. Minor Irrigatior'(K-)        
(utilising less than 1        
TMC annually) 42.3 11.1 31.2 26.2
19. Minor Irrigation (K-2)        
(utilising less than 1        
TMC annually) 2.0 0.1 1.9 1.3
20 Hiranyakeshi Irrigation Project 32.2 - 32.2 12.()
21. Gudavale Lift scheme 3.1 -- 3.1 3.1
.22. Minor Irrigation (utilising less than 1 TMC annually) 1.9 1.0 0.9 0.9
23. Tala Hydel Works 45.0 45.1    
24. Mutha Syslem ex-Khadakwasla 13.1 23.5 9.6 9.6
  (1.1) (1.1)    
25. Kukadi Project 38.9 20.1 18.8 18.8
  (2.0) (2.0)    
26. Ghod Dam Project 10.4 10.4    
27. Chaskaman Project (10.0) _ (10.0) _

Table 8.4 Condt.

St.. No. Name of Project Demand
(TMC)
Protected
Utilisation
(TMC)
Balance
Demand
(TMC)
Demand out of
Balance 75 Per
cent Dependable
Flows(TMC')
         
28. Kundali Project (2.5) - (2.5) -
29. Bhima Irrigation Project 90.7 90.2 0.5  
30. Nira System ex-Vir 65.2 34.6 15.9 15.9
      14.7  
31. Barhanpur Project 1.5 - 1.5 1.5
32. Mhaswad Project 2.2 2.2 - -
33. Ashti Project 1.0 0.7 0.3 -
34. Begumour Lift Scheme 5.3 - 5.3 5.3
  (10.1) (10.1)    
35. Sina at Nimgaon 1.8 - 1.8 1.8
36. Mangi Project 1.2 1.1 0.1  
37. Sina at Kolagaon Project 4.3 - 4.3 4.3
38. Ekruk Tank Project 2.0 1.8 0.2  
39. Khasapur Project 1.3 1.3 - -
40. Hingni Pangaon Project 1.6 - 1.6 1.6
41. Sina Lift Scheme 3 0 - 3.0 3.0
  (3 0) (3 0)    
42. Sholapur City Water Supply 1.6 0.3 1.3 -
43. Minor Irrigation (K-5)        
(ulilising less than I        
TMC annually) 28.5 4.8 23.7 16.4
44. Kumoor Project 1.9 1.5 0.4. -
45. Minor Irrigation (K-6)        
(ulilising less than I        
TMC annually) 2.5 0.1 2.4 2.4
Total 828.8 439.6 389.6 280.4
  (32.2) (31.8)    

Continue


Contents - Previous - Next